Two panes of glass at a high level on the Turner Street side of the Blizard Building will be replaced during the day on Saturday 2 and Sunday 3 December.
The lab can be accessed if necessary, but ground and first floor office spaces will be out of bounds.
An air handling unit will need to be turned off during this time, which means the air temperature in the open lab may be a little warmer than usual for two to three hours while the works are taking place.
Rachael Parker (rachael.parker@qmul.ac.uk)